Class A fit-out in Shenzhen ranges from $1400–$2100/sqft for basic specification to $5000–$7400/sqft for trophy.

  • Basic fit-out: $1400–$2100/sqft.
  • Mid spec: $2200–$3300/sqft.
  • High-end: $3400–$5000/sqft.
  • Trophy: $5000–$7400/sqft.
  • Always model fit-out as amortised capex inside total occupancy cost.

Shenzhen office fit-out costs

Class A fit-out">fit-out in Shenzhen ranges from $1400–$2100/sqft for basic specification to $5000–$7400/sqft for trophy.

TL;DR

  • Basic fit-out: $1400–$2100/sqft.
  • Mid spec: $2200–$3300/sqft.
  • High-end: $3400–$5000/sqft.
  • Trophy: $5000–$7400/sqft.
  • Always model fit-out as amortised capex inside total occupancy cost.

Cost bands

**Basic** ($1400–$2100/sqft): functional Cat-B with standard finishes and basic AV. **Mid** ($2200–$3300/sqft): branded reception, mix of meeting rooms, mid-grade AV, light biophilic touches. **High-end** ($3400–$5000/sqft): full client-facing programming, premium furniture, specialist AV. **Trophy** ($5000–$7400/sqft): fully bespoke design, signature staircase or feature, top-tier MEP and acoustic packages.

What drives variation

Local labour rates, MEP and AV scope, contingency, FF&E selection, and the building's Cat-A condition. Always price scenarios against landlord's TI to land on net-out-of-pocket capex.

Working with the landlord allowance

Use the Fit-out Budget Estimator with your spec level to benchmark; subtract landlord-funded TI to land on net spend. Over-allowance spend is amortised into rent — negotiate the rate up front.

Key facts

cityShenzhen
countryChina
regionAPAC
classARentLocal290 CNY/sqft/yr
classARentUsd$40/sqft/yr
vacancy24.8%
typicalLeaseYears5
typicalRentFreeMonths10
submarkets5
primeYieldPct5.4%
basicFitoutPsf$1400–$2100/sqft
midFitoutPsf$2200–$3300/sqft
highEndFitoutPsf$3400–$5000/sqft
trophyFitoutPsf$5000–$7400/sqft

Frequently asked questions

What does a Shenzhen Class A fit-out cost?
From $1400–$2100/sqft for Basic to $5000–$7400/sqft for Trophy specification. Mid-spec — the most common — is $2200–$3300/sqft.
Are MEP and AV included in those bands?
Yes — bands include MEP, AV/IT cabling, FF&E, and a typical contingency.

Editorial provenance

Reviewed by Kenji Watanabe — APAC contributing editor. Last updated 2026-04-15. See our methodology and editorial standards.

Primary sources for this page

Full sources index · Submit a correction

Related topics

  • Fit-out Capex — How to budget, sequence, and govern Class A office fit-out capex.
  • US TIA Strategy — How to negotiate, draw down, and account for US tenant improvement allowances (TIA).