Seoul Class A vacancy is 5.2% with the market trending rising — pipeline visibility matters more than headline vacancy.

  • Headline vacancy: 5.2%; trend rising.
  • Trophy submarket (Jongno / Gwanghwamun (CBD)) typically clears at half headline vacancy.
  • New construction lead time is 36–60 months — pipeline is largely fixed for the next cycle.
  • Pre-let activity dominates the new-build pipeline.

Seoul Class A office availability and pipeline

Seoul Class A vacancy is 5.2% with the market trending rising — pipeline visibility matters more than headline vacancy.

TL;DR

  • Headline vacancy: 5.2%; trend rising.
  • Trophy submarket (Jongno / Gwanghwamun (CBD)) typically clears at half headline vacancy.
  • New construction lead time is 36–60 months — pipeline is largely fixed for the next cycle.
  • Pre-let activity dominates the new-build pipeline.

Headline vs trophy availability

Headline Seoul Class A vacancy of 5.2% includes a long tail of older, less-amenitised stock. The trophy tier in Jongno / Gwanghwamun (CBD) typically clears at materially below headline.

Pipeline visibility

Construction lead times of 36–60 months mean the next cycle's supply is already largely visible. Tracked pipeline includes 3 notable assets in Seoul.

Key facts

citySeoul
countrySouth Korea
regionAPAC
classARentLocal142000 KRW/sqft/yr
classARentUsd$102/sqft/yr
vacancy5.2%
typicalLeaseYears5
typicalRentFreeMonths6
submarkets6
primeYieldPct4%

Frequently asked questions

Is Seoul Class A office tight right now?
Headline vacancy is 5.2%. Trophy is materially tighter; older Class A and Class B carry the long tail.

Editorial provenance

Reviewed by Kenji Watanabe — APAC contributing editor. Last updated 2026-04-15. See our methodology and editorial standards.

Primary sources for this page

Full sources index · Submit a correction