Perth Class A vacancy is 14.6% with the market trending rising — pipeline visibility matters more than headline vacancy.

  • Headline vacancy: 14.6%; trend rising.
  • Trophy submarket (Perth CBD / St Georges Terrace) typically clears at half headline vacancy.
  • New construction lead time is 36–60 months — pipeline is largely fixed for the next cycle.
  • Pre-let activity dominates the new-build pipeline.

Perth Class A office availability and pipeline

Perth Class A vacancy is 14.6% with the market trending rising — pipeline visibility matters more than headline vacancy.

TL;DR

  • Headline vacancy: 14.6%; trend rising.
  • Trophy submarket (Perth CBD / St Georges Terrace) typically clears at half headline vacancy.
  • New construction lead time is 36–60 months — pipeline is largely fixed for the next cycle.
  • Pre-let activity dominates the new-build pipeline.

Headline vs trophy availability

Headline Perth Class A vacancy of 14.6% includes a long tail of older, less-amenitised stock. The trophy tier in Perth CBD / St Georges Terrace typically clears at materially below headline.

Pipeline visibility

Construction lead times of 36–60 months mean the next cycle's supply is already largely visible. Tracked pipeline includes 5 notable assets in Perth.

Key facts

cityPerth
countryAustralia
regionAPAC
classARentLocal660 AUD/sqft/yr
classARentUsd$440/sqft/yr
vacancy14.6%
typicalLeaseYears7
typicalRentFreeMonths12
submarkets5
primeYieldPct6%

Frequently asked questions

Is Perth Class A office tight right now?
Headline vacancy is 14.6%. Trophy is materially tighter; older Class A and Class B carry the long tail.

Editorial provenance

Reviewed by Class A Atlas Editorial Desk — House byline · global editorial team. Last updated 2026-04-15. See our methodology and editorial standards.

Primary sources for this page

Full sources index · Submit a correction