Dubai Class A vacancy is 5.8% with the market trending rising — pipeline visibility matters more than headline vacancy.

  • Headline vacancy: 5.8%; trend rising.
  • Trophy submarket (DIFC) typically clears at half headline vacancy.
  • New construction lead time is 36–60 months — pipeline is largely fixed for the next cycle.
  • Pre-let activity dominates the new-build pipeline.

Dubai Class A office availability and pipeline

Dubai Class A vacancy is 5.8% with the market trending rising — pipeline visibility matters more than headline vacancy.

TL;DR

  • Headline vacancy: 5.8%; trend rising.
  • Trophy submarket (DIFC) typically clears at half headline vacancy.
  • New construction lead time is 36–60 months — pipeline is largely fixed for the next cycle.
  • Pre-let activity dominates the new-build pipeline.

Headline vs trophy availability

Headline Dubai Class A vacancy of 5.8% includes a long tail of older, less-amenitised stock. The trophy tier in DIFC typically clears at materially below headline.

Pipeline visibility

Construction lead times of 36–60 months mean the next cycle's supply is already largely visible. Tracked pipeline includes 4 notable assets in Dubai.

Key facts

cityDubai
countryUnited Arab Emirates
regionEMEA
classARentLocal145 AED/sqft/yr
classARentUsd$39/sqft/yr
vacancy5.8%
typicalLeaseYears3
typicalRentFreeMonths3
submarkets6
primeYieldPct7.5%

Frequently asked questions

Is Dubai Class A office tight right now?
Headline vacancy is 5.8%. Trophy is materially tighter; older Class A and Class B carry the long tail.

Editorial provenance

Reviewed by Samuel Okafor — EMEA contributing editor. Last updated 2026-04-15. See our methodology and editorial standards.

Primary sources for this page

Full sources index · Submit a correction

Related topics