Class A fit-out in Bangkok ranges from $1800–$2600/sqft for basic specification to $6000–$9000/sqft for trophy.

  • Basic fit-out: $1800–$2600/sqft.
  • Mid spec: $2700–$4000/sqft.
  • High-end: $4100–$6000/sqft.
  • Trophy: $6000–$9000/sqft.
  • Always model fit-out as amortised capex inside total occupancy cost.

Bangkok office fit-out costs

Class A fit-out">fit-out in Bangkok ranges from $1800–$2600/sqft for basic specification to $6000–$9000/sqft for trophy.

TL;DR

  • Basic fit-out: $1800–$2600/sqft.
  • Mid spec: $2700–$4000/sqft.
  • High-end: $4100–$6000/sqft.
  • Trophy: $6000–$9000/sqft.
  • Always model fit-out as amortised capex inside total occupancy cost.

Cost bands

**Basic** ($1800–$2600/sqft): functional Cat-B with standard finishes and basic AV. **Mid** ($2700–$4000/sqft): branded reception, mix of meeting rooms, mid-grade AV, light biophilic touches. **High-end** ($4100–$6000/sqft): full client-facing programming, premium furniture, specialist AV. **Trophy** ($6000–$9000/sqft): fully bespoke design, signature staircase or feature, top-tier MEP and acoustic packages.

What drives variation

Local labour rates, MEP and AV scope, contingency, FF&E selection, and the building's Cat-A condition. Always price scenarios against landlord's TI to land on net-out-of-pocket capex.

Working with the landlord allowance

Use the Fit-out Budget Estimator with your spec level to benchmark; subtract landlord-funded TI to land on net spend. Over-allowance spend is amortised into rent — negotiate the rate up front.

Key facts

cityBangkok
countryThailand
regionAPAC
classARentLocal1100 THB/sqft/yr
classARentUsd$31/sqft/yr
vacancy24.6%
typicalLeaseYears3
typicalRentFreeMonths4
submarkets5
primeYieldPct5.6%
basicFitoutPsf$1800–$2600/sqft
midFitoutPsf$2700–$4000/sqft
highEndFitoutPsf$4100–$6000/sqft
trophyFitoutPsf$6000–$9000/sqft

Frequently asked questions

What does a Bangkok Class A fit-out cost?
From $1800–$2600/sqft for Basic to $6000–$9000/sqft for Trophy specification. Mid-spec — the most common — is $2700–$4000/sqft.
Are MEP and AV included in those bands?
Yes — bands include MEP, AV/IT cabling, FF&E, and a typical contingency.

Editorial provenance

Reviewed by Kenji Watanabe — APAC contributing editor. Last updated 2026-04-15. See our methodology and editorial standards.

Primary sources for this page

Full sources index · Submit a correction

Related topics

  • Fit-out Capex — How to budget, sequence, and govern Class A office fit-out capex.
  • US TIA Strategy — How to negotiate, draw down, and account for US tenant improvement allowances (TIA).